Description
| Specification | Value |
|---|---|
| Capacity | 2GB |
| DRAM Type | DDR3 |
| Form Factor | DDR3 Long Dimm |
| Part Number | EVMT2G1600U86P |
| Chip Density | 256Mx8 8Chips / 256Mx8 16Chips / 256Mx16 4Chips / 256Mx16 8Chips / 512Mx8 8Chips / 512Mx8 16Chips |
| Frequency (speed) | 1600MHz |
| Bandwidth | PC3-10600 |
| CAS Latency | 11.0 / 9.0 / 7.0 |








Reviews
There are no reviews yet.